Goliath Resources Ltd. (TSXV: GOT) has announced standout results from its ongoing 2025 drill campaign at the Surebet discovery within the Golddigger Property in British Columbia’s Golden Triangle.
Drill hole GD-25-337 intersected 10.60g/t gold over 22.82m, including high-grade sub-intervals of 15.19g/t over 15.7m, with peaks of 37.28g/t over 3.36m and 36.11g/t over 3.08m.
Remarkably, 100% of the drill holes completed to date have intercepted significant quartz-sulphide mineralization, and 95% of holes in 2025 have encountered visible gold that’s visible to the naked eye, underscoring the continuity and high-grade potential of the system.
To date, Goliath has completed 65 drill holes totaling 45,000m as part of its up-to-60,000m, nine-rig programme. With around 15,000m left to drill over roughly one month, the company is on track to complete the program. Assays are pending for 55 of these holes.
Since drilling began in 2021, Goliath has posted an exceptional number of high-grade hits: nine holes exceeded 200 gram-metres; 11 exceeded 150m; 25 exceeded 100gm; 31 exceeded 75gm; and 61 exceeded 50gm. The mineralized zone spans more than 1.8km², larger than half of New York’s Central Park, and remains wide open for expansion.
These results reinforce the view that the Surebet discovery remains one of the most promising high-grade gold systems in the Golden Triangle in recent years.
For more details, visit www.goliathresourcesltd.com
To read more articles like this, please visit www.theassay.com/news







