Goliath Resources (TSXV: GOT) has reported new results from its 2025 drilling campaign at the Surebet Discovery on the Golddigger Property in British Columbia’s Golden Triangle. Drill hole GD-25-328 intersected 18.58g/t Au over 5m, including 23.22g/t over 4m and 30.95g/t over 3m, all approximately true widths.
The company stated that all drill holes completed to date have intersected quartz-sulphide mineralization, with visible gold observed in 90% of holes. So far, 82 holes totaling 55,000m have been drilled, with 33 holes (5,000m) remaining in the 60,000m programme utilizing nine rigs.
Other reported intercepts include GD-25-355, which cut 5.72g/t Au over 12.2m including 20.2g/t over 3.2m; GD-25-345, which intersected two mineralized zones with 5.09g/t over 9m (including 14.88g/t over 3m) and 4.22g/t over 6.03m (including 8.50g/t over 2.97m); and GD-25-317, which returned 6.5g/t over 5.15m including 10.22g/t over 3.3m.
According to the company, mineralization has been identified in three distinct rock packages, stacked quartz-sulphide veins, Eocene-aged RIRG dykes, and calc-silicate altered breccias, and remains open in all directions.
Assays are pending for a significant portion of the completed holes, with further results expected through late 2025 and into 2026.
For more information, visit www.goliathresourcesltd.com
To read more articles like this, please visit www.theassay.com/news







