Banyan Gold Corp. (TSX-V: BYN | OTCQB: BYAGF) has reported further success from its ongoing drill program at the AurMac Project in Yukon, Canada, intersecting high-grade gold mineralization at the Airstrip deposit and continuing to expand the high-grade domains.
Drill Highlights Include:
- AX-25-708 – 3.66 g/t Au over 17.6 metres (“m”), including 6.80 g/t Au over 9.3m, with high-grade interval of 35.98 g/t Au over 1.6m
- AX-25-640 – 1.25 g/t Au over 5.4m within 0.72 g/t Au over 13.0m
- AX-25-703 – 2.04 g/t Au over 11.4m, including 3.60 g/t Au over 5.6m with a high-grade interval of 7.98 g/t Au over 1.2m
- AX-25-711 – 1.25 g/t Au over 7.00m
- AX-25-712 – 1.36 g/t Au over 15.3m including 1.87 g/t Au over 9.1m
- AX-25-714 – 1.12 g/t Au over 18.4m including 2.12 g/t Au over 6.7m and 1.49 g/t Au over 4.6m
Tara Christie, President and CEO of Banyan Gold commented, “These results continue to highlight the >1g/t Au near-surface mineralized domains in AurMac.”
“We continue to see strong replacement (skarn) style mineralization at Airstrip in the lower calcareous metasedimentary unit that contacts the felsic dyke (Cal 2) that was intersected in hole AX-25-650 (see News Release dated June 25, 2025),” stated Duncan Mackay, Vice President of Exploration. “Extending very high-grade mineralization over 100m down dip with an interval of 35.98 g/t Au over 1.6m (calculated true thickness is approx. 1.5m) highlights the potential to continue to add ounces to the Airstrip deposit and improve areas of the existing Mineral Resource Estimate. The high-grade core of Airstrip associated with the felsic dyke contact now extends over 500m along strike and nearly 300m down dip.”
To read more about this, please visit https://banyangold.com/
For more articles like this, please visit https://www.theassay.com/
To meet with Banyan Gold at 121 Mining Investment Dubai on 26-27 November, register here: https://dubai.121mininginvestment.com/home






