Black Rock Mining Limited (ASX:BKT) is an Australian-based company listed on the Australian Securities Exchange. The Company owns graphite tenure in the Mahenge region of Tanzania.

The Company’s 100%-owned Mahenge Graphite Project is one of the largest JORC-compliant flake graphite Mineral Resource Estimates globally, with a Mineral Resource Estimate of 211.9m tonnes at 7.8% TGC for 16.6m tonnes of contained graphite. Importantly, more than 50% of the Mineral Resource is in the Measured and Indicated categories.

Black Rock released an exceptional optimised Preliminary Feasibility Study (PFS) for the Mahenge Graphite Project, which considered a three-stage construction to deliver up to 250,000 tonnes per annum of 98.5% graphite concentrate for 31 years. The Company plans to fund stages two and three from free cash flow. The pre-production capex is US$90.1m to deliver a post-tax unlevered project NPV10 of US$905m incorporating the proposed 16% government free carry and increased royalty rate.

The optimised PFS confirmed Black Rock has the potential for a long-life, low capex, high margin operation. Black Rock is moving towards commencing a Definitive Feasibility Study (DFS). Following the successful completion of the DFS and the associated financing, construction is expected to commence late-2018 with first production in 2019.

INVESTMENT HIGHLIGHTS

  • 100% Project Ownership – Black Rock Mining has a 100% interest in the Mahenge Graphite Project located in Tanzania
  • Exceptional PFS – Optimised PFS completed in Aug 2017 with the following key metrics
    • Long life and meaningful scale – Three stage construction to deliver 250k tonnes per annum for 31 years
    • Low capex – Pre-production capex only US$90m for 83k tonnes per annum
    • Cash flow funding – Stages two and three funded from cash flow
    • Low opex – Steady state opex of US$378 per tonne (likely to be lower with train)
    • Brilliant financial metrics – Post tax unlevered NPV10 of US$905m with IRR of 45.1% inclusive of 16% Government free carry
  • Industry leading graphite – Industry leading product attributes (concentrate grade and flake size distribution) confirmed in first pilot plant test
  • Simple processing – Arguably the most simple process flow sheet in the industry
  • Strong management capability – Proven management team focused on project execution
  • Path to market established – Real partners in place
  • Graphite market improving – Graphite market dynamics becoming increasingly positive
Live Financials

Latest Announcements

Share Price Performance

DIRECTORS & MANAGEMENT

John de Vries – CEO, Managing Director
Richard Crookes – Non-Exective Chairman
Gabriel Chiappini – Non-Executive Director & Company Secretary
Stephen Copulos – Non-Executive Director

MAJOR SHAREHOLDERS

Copulos Group – 24.63%
Top 20 Shareholders – ~50%

VIDEOS

PROJECTS


Mahenge – Graphite Project

3 graphite mineralised structures located within Exploration permit PL7802/2012:

  • Epanko North
  • Ulanzi
  • Cascades
STRATEGY – Black Rock’s Company Strategy is to deliver shareholder wealth in FY18 by having a clear focus.

MAHENGE GRAPHITE PROJECT

  • Three stage construction to deliver a maximum of 250k tonnes per annum of 98.5% graphite concentrate for 31 years. Stages two and three to be funded from free cash flow
  • Pre-production capex of US$90.1m
  • Steady state opex of US$378 per tonne
  • Realistic basket price assumption of US$1,241 per tonne delivering an operating margin of US$863 per tonne
  • Assumed feed grade of 8.5% TGC
  • Life of mine strip ratio of 0.8:1 (early years are 0.5:1)
  • Post-tax unlevered project NPV10 of US$905m
  • Post-tax, unlevered IRR of 45.1%
  • EBITDA in first full year of production US$220 million (EBITDA margin of 66%)

EXECUTION TIMELINE

MEIWA

  • Part of Mitsubishi group of companies
  • Existing major player in battery space

BOTIAN

  • Existing spherioniser in Chinese market
  • Creates capacity to deliver final product without investing capital, organisational development and management bandwidth

BATTERY TESTING

  • Long cycle data available to customers to facilitate acceptance testing
  • Concentrate from pilot plant testworks in hands of potential customers and partners

Contact Details

WEBSITE: www.blackrockmining.com.au

EMAIL: info@blackrockmining.com.au

PHONE: +61 8-9320-7550

[easy-social-share buttons=”facebook,twitter,google,linkedin,print,mail” counters=0 style=”icon” template=”clear-retina” nospace=”yes”]

Subscribe To The Assay Weekly Newsletter

Thank you for subscribing

Want Even More Insights?

The Assay Weekly is a weekly newsletter, powered by The Assay, bringing you even more mining industry news and insight, as well as updates on company performance. Simply sign up below to start receiving The Assay Weekly in your inbox.

Thank You For Subscribing

Look out for next edition of The Assay Weekly.